
Here I’m making up the cabin sides after the deck has been laid and the interior of the boat painted. As usual the workshop is over full as evidenced by the pile of stuff in the foreground.

Yhis in the cabin interior layout. There is access to all areas under the seat and the opening aft of the clamps in the picture is where the chemical toilet will. I was still waiting on delivery of the toilet at this time, (COVID delay) so had to get on with as much as possible in its absence.

Final installation of the cockpit sole and margin piece to keep things from rolling into the bilge.
If you would like to discuss having your own boat built, restored or repaired don’t hesitate to contact me, either through the contact page, by email or by phone +353 86 1586937.
Roeboats, Ballydehob, Co. Cork, t:+353 (0)28 38973 m: +353 (0)86 158 69 37 e:tiernan@roeboats.com