Well progress has been continuing apace on fitting out the hull of Ninigret and while a lot of work has been done I’m afraid there’s very little to show you. Most of the cabin fit out is complete and is currently being painted before installation. So that’s just a pile of wood and an empty space in the hull. The bilge has been painted and shouldn’t need to be redone for a very long time. The two part epoxy paint I used is rated for use in chemical tankers so it’s pretty tough stuff and boy is it hard to sand. The cockpit floor is in and all of the parts for the motor well are fabricated and being painted. This week I’ve started on the deck ( you can see the first of the deck beams in the right hand side of the photo ) and hopefully soon enough it will start to look like I’ve been doing something.